Documents guide how the demolition will unfold


22 August 2017

At the time that Orange City Council considered planning approvals for the demolition, an environmental assessment was completed by independent consultants.

The 'Statement of Environment Effects' examined the stages of the demolition, and outlined the actions that would need to be taken to minimise impact on the neighbourhood.

This assessment covered topics such as noise, dust, contamination and hazardous materials.

These documents can be downloaded here.

Introductory Summary

Appendix A – Indicative demolition methodology

Appendix B – Stage I contamination assessment

Appendix C – Stage II contamination assessment

Appendix D – Hazardous Materials Technical Removal Plan and Hazardous Building Material Assessment

Appendix E – Final Remedial Action Plan

Appendix F – Noise and vibration assessment

Appendix G – Heritage assessments

Appendix H – Plans


Since the initial demolition plans were drafted a number of subsequent changes have been made.

These are described here...(link to be inserted)



Share Documents guide how the demolition will unfold on Facebook Share Documents guide how the demolition will unfold on Twitter Share Documents guide how the demolition will unfold on Linkedin Email Documents guide how the demolition will unfold link

Consultation has concluded