Documents guide how the demolition will unfold
22 August 2017
At the time that Orange City Council considered planning approvals for the demolition, an environmental assessment was completed by independent consultants.
The 'Statement of Environment Effects' examined the stages of the demolition, and outlined the actions that would need to be taken to minimise impact on the neighbourhood.
This assessment covered topics such as noise, dust, contamination and hazardous materials.
These documents can be downloaded here.
Appendix A – Indicative demolition methodology
Appendix B – Stage I contamination assessment
Appendix C – Stage II contamination assessment
Appendix D – Hazardous Materials Technical Removal Plan and Hazardous Building Material Assessment
Appendix E – Final Remedial Action Plan
Appendix F – Noise and vibration assessment
Appendix G – Heritage assessments
Since the initial demolition plans were drafted a number of subsequent changes have been made.
These are described here...(link to be inserted)
Consultation has concluded